I. Project Overview
Client & Scenario: Deep exploration of a lead-zinc mine in Southeast Asia (narrow mountainous sites, rainy and humid conditions). Core Requirements: Wireline core drilling for 1,500m deep holes (core recovery rate ≥ 95%) and adaptability to mountainous transportation and operation.
II. Core Product Configuration (Adapted to Project Needs)
The model is XH-2200 full-hydraulic wireline core drilling rig, equipped with a Weichai 250 engine, a Kawasaki double piston pump, and an Elephant 250 mud pump. It features high horsepower with a torque of 10,000 N·m and 40cm steel crawlers.
III. Key Links in Project Implementation
III. Key Links in Project Implementation
● Production & Testing: 28-day cycle, with core components directly supplied by original manufacturers.
● Delivery & Application: The rig is disassembled for transportation to adapt to mountain roads, and on-site assistance is provided for assembly; 6-month on-site technical support is offered.
● Project Results: The core recovery rate exceeded expectations, the overall project was extremely efficient and smooth, with a 40% increase in efficiency compared to the original equipment. There were no electrical/hydraulic failures, and energy consumption was significantly reduced.