This case study highlights how Xinhao DrillingRig successfully delivered a customized XHRC350 Air Reverse Circulation Drill Rig solution to support rural water well construction in Angola.
The project included:
4 × XHRC350 Air Reverse Circulation Drill Rigs
4 × Air Lift Pumps
20 × PDC (Polycrystalline Diamond Compact) Drill Bits
4 × Diesel Generator Sets
2-Year After-Sales Maintenance Service
Total Project Value: USD 98,500
Client Type: Municipal Water Engineering Contractor (End User)
Location: Angola
Lead Source: Google Search (keywords: air reverse circulation drilling rig for Africa water wells)
The client needed a drilling solution capable of handling:
Red clay soil layers
Mixed cobblestone formations
Drilling depth of at least 100 meters
Due to limited infrastructure in rural Angola:
Equipment had to be modular
Each module ≤150 kg
Compatible with agricultural tricycles
Required independent diesel power system
Suitable for areas without electricity
Operators had limited drilling experience
Required fast, practical training for independent operation
Ambient temperatures exceeding 38°C
Dusty and dry working environment
To improve drilling efficiency in mixed formations:
Enhanced air lift system pressure
Matched with high-wear-resistant PDC drill bits
Provided detailed drilling parameter plans for different soil layers
To meet transport limitations:
Redesigned the rig into 3 main modules:
Power system
Drilling system
Frame system
Ensured each module stayed within weight limits
Installed dual-layer dust protection covers for hydraulic systems
Upgraded cooling fan capacity
Improved overall system durability
Inquiry received via Google search
Response delivered within 2 hours
Provided:
Customized drilling solution
Technical specifications
Previous Africa project case studies
Prioritized manufacturing schedule
Secured early shipping slots
Delivered spare parts (seals, drill bits) together with equipment
Solution:
Portuguese operation manuals
Step-by-step training videos
On-site training:
Theory + hands-on practice
One-on-one guidance
Final assessment to ensure operator readiness
Solution:
Accelerated production timeline
Early logistics coordination
Pre-supplied consumables to avoid downtime
Bilingual support group (Portuguese + Chinese)
24/7 remote technical assistance
Real-time troubleshooting guidance
1-month and 3-month operational check-ins
Preventive maintenance recommendations
2-year warranty on core components (non-human damage)
On-site engineer support within 7 working days if required
Drilling efficiency significantly improved
Project completed 10 days ahead of schedule
“Xinhao’s XHRC350 drilling rig has become a key contributor to Angola’s rural water supply project. The efficiency helped us finish 10 days earlier than planned. More importantly, their service—from solution design to worker training—was seamless. We have already planned to purchase 10 additional units for the next phase.”
Extensive project experience across Africa
Adaptation to high temperature, dust, and complex geology
Tailored solutions based on:
Geological reports
Transportation conditions
Workforce skill levels
Fast response
Localized support materials
Long-term maintenance commitment
An air reverse circulation drilling rig uses compressed air to lift cuttings from the borehole, improving drilling efficiency and cleanliness—especially suitable for water well drilling in loose or mixed formations.
Yes. The XHRC350 is specifically designed for:
High-temperature environments
Remote, off-grid areas
Complex soil conditions common in Africa
Yes. With structured training, localized manuals, and video guidance, operators can quickly achieve independent operation.
Production and delivery timelines can be optimized based on urgency, with priority scheduling available for large or time-sensitive projects.
This Angola project demonstrates how Xinhao DrillingRig combines engineering customization, rapid response, and strong after-sales support to deliver reliable drilling solutions for challenging environments.
For contractors working on Africa water well drilling projects, choosing a partner who understands local conditions and provides end-to-end support is critical—and that is exactly what Xinhao delivers.